Bethel Baptist Church
PublicLift Access
Platinum Lifts installed a DDA compliant Aritco 7000 platform lift at the Bethel Baptist Church, Pembroke Dock.
Local builder Richard Rees, of Point Construction, carried out the works to prepare the lift shaft for the new lift.
The new platform lift was delivered and installed in 2 days.
Testimonial
Hi Rob
Just a quick note regarding the lift installation at Bethal Baptist Church, Pembroke Dock. I would just like to say thankyou for a great job the clients are over the moon with the final product and I must say the way you dealt with everything throughout the job was spot on, you made our life a lot easier, a big thankyou to the installation boys - very professional,
Hope everything is ok with yourselves thank you once again.
Regards
Richard
Richard Rees, Point Construction 28 Ocean Way, Pennar, Pembroke Dock, Pembrokeshire, SA72 6RA - March 2019